Skip to content

Category: Make-Ready

Information about Charlemont Connect make-ready. Make-ready is work to prepare a “path” for the distribution network to run throughout the town. Most of this work is done by the utilities (National Grid and Verizon) to make space on existing utility poles. In some cases, the town may perform make-ready work by installing new underground conduit (e.g. near the town hall or on Hawk Hill Road) or new utility poles (e.g. on the west end of Tower Road) to create a cost-effective path for the distribution network.

Designing Around the Railroad Crossing for Tower Road

Because of the high annual cost of leasing aerial space spanning active railroad tracks, Charlemont is redesigning the crossing at the west end of Tower Road to cross at a public way.  As part of this rerouting, we have applied to install eight new town-owned utility poles for the fiber along a section on the west end of Tower Road. This will result in substantial long-term savings for the town.

Comments closed