TriWire’s been working on the railroad, all the live long day on Friday. Conduit is now in place over the tracks at the Long Bridge railroad crossing and the Tower Rd. railroad crossing! Completing these public way crossings is a project milestone worth celebrating.
With the conduit in place, workers can safely install and maintain the fiber network from outside of the railroad right of way. This reduces risk to the network construction and operations teams and will also result in savings for Charlemont Connect’s ongoing operations.